PROJECTS

MUSSEL FACTORY WATER FEED LINE

MUSSEL FACTORY STAINLESS STEEL TUBE AND FITTINGS WATER FEED LINE

The Metal Company supplied and supported the installation of a water feed line for a mussel factory site. This project was completed with RapidPress Stainless Steel tube and fittings, removing the need for welding and significantly reducing installation time. The RapidPress system offers a comprehensive press-fit range, allowing for projects to be completed quickly with quality materials.

  • Product sizes used: Primarily 168mm RapidPress Tube, with additional sections of 108mm, 76mm RapidPress Tube, and 50NB Pipe.

  • Application: Water feed line to supply a mussel factory.

  • Timeline: Installed in just 4 days, thanks to RapidPress technology – no welding required!

This project highlights how RapidPress delivers efficiency, reliability, and speed for large-scale stainless installations.

The Metal Company supplied and supported the installation of a water feed line for a mussel factory site. This project was completed with RapidPress tube and fittings, removing the need for welding and significantly reducing installation time.

  • Product sizes used: Primarily 168mm RapidPress Tube, with additional sections of 108mm, 76mm RapidPress Tube, and 50NB Pipe.

  • Application: Water feed line to supply a mussel factory.

  • Timeline: Installed in just 4 days, thanks to RapidPress technology – no welding required!

This project highlights how RapidPress delivers efficiency, reliability, and speed for large-scale stainless installations. Contact us today for more information on how RapidPress can improve your operational capabilities in a timely fashion.

Reset Password

LOOKING FOR TRADE DISCOUNTS?
OR Sign in below ▼

Reset Password

LOOKING FOR TRADE DISCOUNTS?
OR Sign in below ▼

Reset Password

CAD ACCESS STARTS HERE!
OR Sign in below ▼

Reset Password

LOOKING FOR TRADE DISCOUNTS?
OR Sign in below ▼